CNC milling
3, 4 and 5-axis machining of aluminium, stainless, tool steel, titanium and engineering plastics.
- Envelope to 1,530 mm
- ±0.005 mm positional
- Ra 0.4 µm finish
ISO 9001:2015 · Shah Alam, Selangor · Est. 2008
Contract machining for semiconductor, medical-device and oil-and-gas customers. Send a STEP file and a drawing; you get a quote in 24 hours, a DFM note on anything we would change, and a measured first article before the batch runs.
Capabilities
Everything below happens in our own plant. We do not sub out machining and re-badge it — the only outsourced steps are anodising, plating and heat treatment, all from approved suppliers with certificates attached to your delivery note.
3, 4 and 5-axis machining of aluminium, stainless, tool steel, titanium and engineering plastics.
Bar-fed turning and mill-turn for shafts, housings, fittings and threaded components.
Hardened-steel detail, tight internal corners and precision ground faces after heat treatment.
Laser cutting, press-brake forming and TIG welding for enclosures, brackets and frames.
Sub-assembly, thread inserts, laser marking, and finishing through approved suppliers.
CMM and vision inspection with full dimensional reports issued against your drawing.
Machine list
| Machine | Type | Working envelope | Spindle | Units |
|---|---|---|---|---|
| Mazak VCN-700D | 3-axis VMC | 1,530 × 760 × 660 mm | 12,000 rpm | 4 |
| DMG Mori DMU 50 | 5-axis milling | 500 × 450 × 400 mm | 18,000 rpm | 2 |
| Okuma Genos L3000 | CNC turning | Ø 340 × 500 mm | 5,000 rpm | 3 |
| Mazak Integrex i-200 | Mill-turn | Ø 380 × 1,011 mm | 5,000 rpm | 1 |
| Sodick AQ537L | Wire EDM | 500 × 350 × 250 mm | — | 2 |
| Okamoto ACC-63DX | Surface grinding | 600 × 300 mm | — | 2 |
Two shifts, 06:00–22:00. Unattended overnight running on the four VMCs for volume work.
From drawing to delivery
Drawing and STEP checked for manufacturability; we flag features that will cost you money for no function.
Fixed price and lead time within 24 hours, with the DFM note attached.
One part machined and measured on the CMM. You approve the report before the batch starts.
Batch run with in-process checks at set frequencies, logged against the job card.
Parts packed with the dimensional report, material certificates and finishing certificates.
Request a quote
STEP, IGES, Parasolid or a PDF drawing. If the tolerance stack is tighter than the part needs, we will say so before you pay for it.